<Past |
Future> |
Zetafax 2012 |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Zetafax 2013 |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Zetafax 2014 |
Divest [5, 7, 8, 9] |
Divest [5, 7, 8, 9] |
Divest [5, 7, 8, 9] |
Divest [7, 8, 9, 10] |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Zetafax 2015 |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [7, 8, 9, 10] |
Divest [9, 10, 11, 12] |
Divest [9, 10, 11, 12] |
Divest [9, 10, 11, 13] |
Divest [9, 10, 11, 13] |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Zetafax 17.0 |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [5, 7, 8, 9] |
Approved w/Constraints [7, 8, 9, 10] |
Divest [9, 10, 11, 12] |
Divest [9, 10, 11, 12] |
Divest [9, 10, 11, 13] |
Divest [9, 10, 11, 13] |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Zetafax 17.1 |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Approved w/Constraints [9, 10, 11, 12] |
Approved w/Constraints [9, 10, 11, 12] |
Approved w/Constraints [9, 10, 11, 13] |
Approved w/Constraints [9, 10, 11, 13] |
Approved w/Constraints [9, 10, 12, 14, 15] |
Approved w/Constraints [9, 10, 12, 14, 15] |
Approved w/Constraints [9, 10, 12, 14, 15] |
Divest [9, 10, 12, 15, 16] |
Zetafax 17.5 |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Unapproved |
Approved w/Constraints [9, 10, 12, 15, 16] |
| | [1] | Per VA Handbook 6500 (Appendix F) all systems with a Moderate or High risk assessment are required to use a FIPS 140-2 compliant DBMS solution to protect information at rest or have mitigating controls documented in an approved System Security Plan (SSP) for the system. It is the responsibility of the system owner to ensure that an appropriate DBMS technology is selected or that mitigating controls are in place and documented in the SSP. Additionally, if PII/PHI/VA sensitive information is involved, FIPS 140-2 certified encryption must be used to encrypt data in transit (and at rest) and the technology must be implemented within the VA production network (not in a DMZ) or additional mitigating controls must be documented in an approved System Security Plan (SSP). | | [2] | Per VA Handbook 6500, Federal Information Processing Standards (FIPS) 140-2 certified encryption must be used to encrypt data in transit and at rest if Personally Identifiable Information (PII), Protected Health Information (PHI) or VA sensitive information is involved or additional mitigating controls must be documented in an approved System Security Plan (SSP). Additionally the technology must be implemented within the VA production network (not in a Demilitarized Zone (DMZ) unless those specific uses and instances of this technology are approved by the Enterprise Security Change Control Board (ESCCB) along with a Memorandum of Understanding and Interconnection Security Agreements (MOU/ISA) which detail the security requirements for those users and systems that share information and resources outside of the VA production network.
Per VA Handbook 6500 (Appendix F) all systems with a Moderate or High risk assessment are required to use a FIPS 140-2 compliant DBMS solution to protect information at rest or have mitigating controls documented in an approved System Security Plan (SSP) for the system. It is the responsibility of the system owner to ensure that an appropriate DBMS technology is selected or that mitigating controls are in place and documented in the SSP.
Finally, new installations or major expansions of this technology must complete a Systems Engineering Design Review (SEDR) prior to implementation. | | [3] | As of April 23, 2015, per the Deputy CIO of Architecture, Strategy and Design (ASD), all technologies in use by the VA require an assessment by the VA Section 508 office. Section 508 of the Rehabilitation Act Amendments of 1998 is a federal law that sets the guidelines for technology accessibility. A VA Section 508 assessment of this technology has not been completed at the time of publication. Therefore, as of April 23, 2015 only users of this technology who have deployed the technology to the production environment, or have project design and implementation plans approved, may continue to operate this technology. In the case of a project that has implemented, or been approved for a specific site or number of users, and that project needs to expand operations to other sites or to an increased user base, it may do so as long as the project stays on the existing version of the technology that was approved or implemented as of April 22, 2015. Use of this technology in all other cases is prohibited.
| | [4] | Finally, new installations or major expansions of this technology must complete a Systems Engineering Design Review (SEDR) prior to implementation. | | [5] | Veterans Affairs (VA) users must ensure VA sensitive data is properly protected in compliance with all VA regulations. All instances of deployment using this technology should be reviewed by the local ISO (Information Security Officer) to ensure compliance with VA Handbook 6500. | | [6] | Per the May 5th, 2015 memorandum from the VA Chief Information Security Officer (CISO) FIPS 140-2 Validate Full Disk Encryption (FOE) for Data at Rest in Database Management Systems (DBMS) and in accordance with Federal requirements and VA policy, database management must use Federal Information Processing Standards (FIPS) 140-2 compliant encryption to protect the confidentiality and integrity of VA information at rest at the application level. If FIPS 140-2 encryption at the application level is not technically possible, FIPS 140-2 compliant full disk encryption (FOE) must be implemented on the hard drive where the DBMS resides. Appropriate access enforcement and physical security control must also be implemented. All instances of deployment using this technology should be reviewed to ensure compliance with VA Handbook 6500 and National Institute of Standards and Technology (NIST) standards. It is the responsibility of the system owner to work with the local CIO (or designee) and Information Security Officer (ISO) to ensure that a compliant DBMS technology is selected and that if needed, mitigating controls are in place and documented in a System Security Plan (SSP). | | [7] | In cases where the technology is used for external connections, a full Enterprise Security Change Control Board (ESCCB) review is required in accordance VA Directive 6004 , VA Directive 6517, and VA Directive 6513. The local ISO can advise on the ESCCB review process. | | [8] | New installations or major expansions of this technology that transmit data over the VA Wide Area Network (WAN) must complete a Systems Engineering Design Review (SEDR) (contact VA e-mail: VA IT ESE SEDR SEG) prior to implementation to ensure proper compliance to VA network design and usage requirements. | | [9] | Users should check with their supervisor, Information Security Office (ISO) or local OIT representative for permission to download and use this software. Downloaded software must always be scanned for viruses prior to installation to prevent adware or malware. Freeware may only be downloaded directly from the primary site that the creator of the software has advertised for public download and user or development community engagement. Users should note, any attempt by the installation process to install any additional, unrelated software is not approved and the user should take the proper steps to decline those installations. | | [10] | Veterans Affairs (VA) users must ensure VA sensitive data is properly protected in compliance with all VA regulations. All instances of deployment using this technology should be reviewed by the local ISO (Information Security Officer) to ensure compliance with VA Handbook 6500. | | [11] | New installations or major expansions of this technology that transmit data over the VA Wide Area Network (WAN) must complete a WAN impact assessment (contact VA e-mail: OIT ITOPS SD Engagement Requests) prior to implementation to ensure proper compliance to VA network design and usage requirements. | | [12] | In cases where the technology is used for external connections, a full Enterprise Security Change Control Board (ESCCB) review is required in accordance VA Directive 6004 , VA Directive 6517, and VA Directive 6513. The local ISO can advise on the ESCCB review process. | | [13] | This technology should only be used when required by a Veterans Affairs (VA) business partner for an approved VA Project. Use of this technology must comply with ESCCB requirements which include: Signed Interconnection Agreements/Memorandum of Understanding agreements (MOU/ISA) with each external business partner, compliance with VA Handbook 6500, and must implement appropriate National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) requirements for all devices interacting with this technology. All instances of deployment using this technology should be reviewed by the local ISO (Information Security Officer) to ensure compliance with VA Handbook 6500 and National Institute of Standards and Technology (NIST) standards. As of January 27th, 2017, Risk-based Decisions (RBD) will be handled per VAIQ # 7769667. In cases where the technology is used for external connections, a full Enterprise Security Change Control Board (ESCCB) review is required in accordance VA Directive 6004, VA Directive 6517
and VA Directive 6513. The local ISO can advise on the ESCCB review process and ensure privacy of information compliance protections are in place. | | [14] | If trialware is utilized, software must be removed or purchased when trial expires. | | [15] | New installations or major expansions of this technology that transmit data over the VA Wide Area Network (WAN) must complete a WAN impact review (contact VA e-mail: [OIT ITOPS SD Engagement Requests]) prior to implementation to ensure proper compliance to VA network design and usage requirements. | | [16] | If free trialware is utilized, the software must be purchased or removed at the end of the trial period. |
|
Note: |
At the time of writing, version 17.5 is the most current version, and an update was released 12/15/2020. |