Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.

VA Technical Reference Model v 24.7

Fluke PowerLog
Fluke PowerLog Technology

General InformationGeneral Information help

Technologies must be operated and maintained in accordance with Federal and Department security and privacy policies and guidelines. More information on the proper use of the TRM can be found on the TRM Proper Use Tab/Section.

Website: Go to site
Description: Fluke PowerLog allows a user to download recorded data from the Fluke power quality meters to a user workstation. The technology also provides users with the ability to generate data tables, view and print time plots of all channels, perform harmonic studies, and export data to other programs. PowerLog has been split into two editions, PowerLog Classic and PowerLog 430-II. Both editions are covered in this assessment.

Note: Please refer to the release notes to identify which edition and version of the software is compatible with each Fluke Device Model Number.

Note: This evaluation covers only the software associated with the hardware, and not the hardware itself.
Technology/Standard Usage Requirements: Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.
Section 508 Information: This technology has not been assessed by the Section 508 Office. The Implementer of this technology has the responsibility to ensure the version deployed is 508-compliant. Section 508 compliance may be reviewed by the Section 508 Office and appropriate remedial action required if necessary. For additional information or assistance regarding Section 508, please contact the Section 508 Office at Section508@va.gov.
Decision: View Decisions

Decision Source: TRM Mgmt Group
Decision Process: One-VA TRM v22.11
Decision Date: 11/14/2022 at 17:43:08 UTC
Aliases: Fluke PowerLog Application; Fluke Power Log Application, Fluke PQ (Power Quality) Analyzer
Introduced By: TRM Request
Vendor Name: Fluke
- The information contained on this page is accurate as of the Decision Date (11/14/2022 at 17:43:08 UTC).